Vizlib Community

Submit a ticket Sign in
Welcome
Login

Scatter - With progress over time highlighted with a path (connecting line)

https://community.qlik.com/t5/Qlik-Sense-App-Development/Lines-between-data-points-on-Scatter-Graph/td-p/1020368


In QlikView it is really quite simple to add a dimension to a scatter graph such that the position of points is plotted for the beginning and the end of a date range and then have a line drawn between the two points. By altering the size of the bubble based on whether the date dim is at the start or the end, you can make it clear which value is where the historical value is and which is the most recent. The line then gives an excellent indication of which direction a particular point is moving in.

Image1.png
(52.2 KB)
  • Hi Brian,

    Thanks for your feedback! Makes a lot of sense.

    We do have an extra dimension to provide a time context (snail-trail), but I agree that it's also valuable to see the progression at the same time.


    Best,


    David

Login to post a comment